Answer: For products subject to regular, ongoing follow-up inspections, the required number of inspections is noted in the approved quality documentation. For products that do not require regular ongoing inspections, there must be a qualifying inspection of the manufacturing facility before the evaluation report is issued, and an annual follow-up inspection thereafter.